Case Study Huntington WTW - Electro Chlorination Plant

Overview

Huntington WTW was designated a top tier COMAH site and was rated in the top three sites in the UK for potential impact. As such the project had a high level of intervention from the Health & Safety Executive for our client GCA. The Electro chlorination plant was developed to negate the need for hazardous liquid chlorine to be stored on the site. CLIENT: Galliford, Costain, Atkins (GCA) PROJECT: Electro-chlorination plant VALUE: £ 650,000 SCOPE: Electrical & Instrumentation Installation