Case Study Huntington WTW - Electro Chlorination Plant

Overview

Huntington WTW was designated a top tier COMAH site and was rated in the top three sites in the UK for potential impact. As such the project had a high level of intervention from the Health & Safety Executive for our client GCA. The Electro chlorination plant was developed to negate the need for hazardous liquid chlorine to be stored on the site.

CLIENT: Galliford, Costain, Atkins (GCA)
PROJECT: Electro-chlorination plant
VALUE: £ 650,000
SCOPE: Electrical & Instrumentation Installation

The Project

Picow Electrical were employed by Galliford Costain Atkins, on behalf of United Utilities, to undertake the electrical and instrumentation design and installation on the new Electro-chlorination plant at Huntington WTW.

Picow were entrusted to complete this project under very demanding timescales. In order to achieve these timescales Picow and GCA engineers worked closely throughout the process to allow the design documents to be issued to site on time throughout the key stages of the installation.

Our scope of works involved the full electrical installation including primary low voltage distribution, primary and secondary cable management systems, hardwired power and control cabling to instruments and control panels, Profibus DP & PA networks, fibre optic networks, general building services power and lighting, trace heating power and control systems and also fire and intruder alarm systems. The above installations incorporated hazardous area design, installation and inspections in accordance with the United Utilities / GCA DSEAR Risk Assessment.