Case Study Murphy Group - Newton Heath LMD

CLIENT        : Network Rail
PROJECT    : Newton Heath HV/LV Upgrade
VALUE         : £ 450,000
SCOPE        : Electrical Installation

Due to expansion within the facilities at Newton Heath LMD in Manchester, Network Rail issued Picow the task of designing a new electrical infrastructure to accommodate the additional requirements. Our project management team were responsible for the seamless integration of the new low voltage equipment to replace the existing hardware.

Our scope of works included the following:

  • Full electrical survey
  • Detailed electrical design
  • New LV Equipment
  • Assisting Transformer Upgrade