Case Study GCA - Preston WwTw SBAP
CLIENT : Galliford Costain Atkins (on behalf of United Utilities)
PROJECT : Preston WwTW SBAP
VALUE : £210,000
SCOPE : Design & Build EC&I Installation
Picow Engineering Group were entrusted by Galliford Costain Atkins (GCA), on behalf of United Utilities, to undertake the electrical and instrumentation design and installation with regards to the Preston WwTW SBAP Enabling project.
Our scope of works included the following:
- Full electrical design
- Power & control cabling
- Instrumentation
- Lighting
- Power outlets
- Lightning protection
- Gas detection system
- Profibus monitoring system
- Commissioning assistance